AXIS a.s. has experience not only with the installation of new technology but also with the disassembly and relocation of technological units. For this project the press, dryer, molding line, vessels and other secondary parts of the technology were dismantled. All parts were properly dismantled, inspected and then marked and prepared for safe transport within the EU. This project lasted approx. 18 months and 15 specialists participated on a ongoing basis.
